Ninyo & Moore conducted three combined Geotechnical Evaluations and Phase I/Phase II Environmental Site Assessments at a proposed landfill redevelopment site, which included demolition of existing buildings and construction of an industrial distribution center over former gravel pits reportedly used for construction debris dumping.

Project Highlights:

  • Geotechnical Evaluation
  • Phase I Environmental Site Assessment
  • Phase II Environmental Site Assessment
  • Soil and Soil Gas Sampling
  • VCUP Application
  • MMS Installation Oversight

Ninyo & Moore conducted two separate rounds of soil and soil gas sampling to determine geotechnical suitability, environmental characteristics, and methane impacts at the site as directed by Adams County and the Tri-County Health Department. Methane was detected in soil gas samples during both previous sampling events and methane mitigation systems were recommended for the proposed new buildings. The Colorado Department of Public Health and Environment’s Voluntary Cleanup Program (VCUP) was recommended for the site and subsequent groundwater monitoring was requested and conducted. Domestic waste was found in small quantities in the north and east portions of the site. The site was deemed suitable for construction even though up to 30 feet of previous undocumented fill was encountered. Ninyo & Moore worked with the design team to come up with a viable solution for spread footings and a slab-on-grade floor bearing within the fill materials. A VCUP application was submitted and approved, which included a Materials Management Plan (MMP) for any required soil remediation during construction. MMP oversight was conducted during construction including the installation of a Methane Mitigation System (MMS) in accordance with the approved VCUP. As part of the overall environmental plan for the site, a sub-grade storm water detention vault was constructed. Ninyo & Moore also conducted design support and installation oversight of the storm water system, in accordance with State and local municipal guidelines. The storm water detention vault was designed and constructed to manage storm water volume and help prevent flooding and erosion in the adjacent receiving creek.

Project Details

Client:

Karis Partners

Location:

Denver, Colorado

Services

Geotechnical

Clients of Ninyo & Moore receive the services of professional geotechnical engineers and engineering geologists that are familiar...

Environmental

Clients turn to Ninyo & Moore environmental consultants for innovative solutions to complex environmental challenges.

Materials Testing and Inspection

Our Materials Testing Division provides full-scope soils, materials testing, and special inspection services utilizing...

 

 

Administratively Qualified (AQ) with TxDOT

Ninyo & Moore is pleased to announce that we are now Administratively Qualified (AQ) with TxDOT.

Learn More
 
 

RANKED NO. 3!

Engineering News-Record (ENR) ranks Ninyo & Moore No. 3 Geotechnical Engineering Firm and No. 192 Overall

 

Learn More

Featured Projects

metro

© Los Angeles County Metropolitan Transportation Authority - Regional Connector Transit Project

Metro Regional Connector

Career Opportunities

Collaborate with industry experts who are passionate about making a positive impact on the environment around us.

Join our team!

Learn More

Social Media

SAFETY IS KEY

We are committed to a safe workplace.

Learn More

ENGINEERING

Continuing to deliver new engineering advances so our clients receive superior results.

Learn More
 
 

INDUSTRY EXPERTS

Seamless integration of technical and project management experts so you achieve predictable and successful results.

Learn More

NINYO & MOORE We transform today so our world is a better place tomorrow.